Exploration

In order to carry out an accurate and appropriate project for facilities that require a water treatment unit, the following steps should be taken:

Determine the capacity of the existing system or, if there is no existing system, calculate the daily water demand of the facility.

Identify the reasons for the facility’s need for a water treatment system.

Determine the location where the system will be installed.

Since water characteristics can vary by region, a detailed water analysis is essential for proper project planning. This process is conducted free of charge in our company’s laboratories.

Our company provides a free assessment service by our expert engineers to ensure that a precise and suitable project is developed.

Project

In order to carry out a precise and suitable project for facilities in need of a water treatment unit, the following steps should be taken:

Determine the capacity of the existing system or, if there is no existing system, calculate the daily water demand.

Identify the reasons why the facility requires such a system.

Specify the location where the system will be installed.

Due to the variability of water characteristics in different regions, a detailed water analysis is necessary for accurate project planning. This procedure is conducted free of charge in our company’s laboratories.

Our company provides a free assessment service by our expert engineers to ensure that an accurate and appropriate project is carried out.

Assembly

In order to carry out a precise and suitable project for facilities in need of a water treatment unit, the following steps should be taken:

Determine the capacity of the existing system or, if there is no existing system, calculate the daily water demand.

Identify the reasons why the facility requires such a system.

Specify the location where the system will be installed.

Due to the variability of water characteristics in different regions, a detailed water analysis is necessary for accurate project planning. This procedure is conducted free of charge in our company’s laboratories.

Our company provides a free assessment service by our expert engineers to ensure that an accurate and appropriate project is carried out.

Consultancy

In order to carry out a precise and suitable project for facilities in need of a water treatment unit, the following steps should be taken:

Determine the capacity of the existing system or, if there is no existing system, calculate the daily water demand.

Identify the reasons why the facility requires such a system.

Specify the location where the system will be installed.

Due to the variability of water characteristics in different regions, a detailed water analysis is necessary for accurate project planning. This procedure is conducted free of charge in our company’s laboratories.

Our company provides a free assessment service by our expert engineers to ensure that an accurate and appropriate project is carried out.

Our Solutions

Online Technical Support

Online Shopping